Spec·Reference

Piping

Pipe Size Chart (NPS)

Nominal pipe size is a label, not a measurement. This table gives the dimensions that actually matter — outside diameter, wall, bore and flow area.

Below 14″, NPS does not equal any real dimension: 2″ pipe has a 2.375″ OD and a 2.067″ bore in Sch 40. Going from Schedule 40 to 80 shrinks the bore about 7.4% but cuts flow area about 14.1% — the area penalty is roughly double the diameter penalty.

Nominal pipe size to outside diameter, wall thickness, inside diameter and flow area by schedule
1/8Sch 100.4050.0490.30700.07400.187
1/8Sch 400.4050.0680.26900.05680.245
1/8Sch 800.4050.0950.21500.03630.315
1/4Sch 100.5400.0650.41000.13200.330
1/4Sch 400.5400.0880.36400.10410.425
1/4Sch 800.5400.1190.30200.07160.536
3/8Sch 100.6750.0650.54500.23330.424
3/8Sch 400.6750.0910.49300.19090.568
3/8Sch 800.6750.1260.42300.14050.740
1/2Sch 100.8400.0830.67400.35680.672
1/2Sch 400.8400.1090.62200.30390.852
1/2Sch 800.8400.1470.54600.23411.089
1/2Sch 1600.8400.1880.46400.16911.311
3/4Sch 101.0500.0830.88400.61380.858
3/4Sch 401.0500.1130.82400.53331.132
3/4Sch 801.0500.1540.74200.43241.475
3/4Sch 1601.0500.2190.61200.29421.946
1Sch 101.3150.1091.09700.94521.405
1Sch 401.3150.1331.04900.86431.681
1Sch 801.3150.1790.95700.71932.174
1Sch 1601.3150.2500.81500.52172.847
1-1/4Sch 101.6600.1091.44201.63311.807
1-1/4Sch 401.6600.1401.38001.49572.275
1-1/4Sch 801.6600.1911.27801.28283.000
1-1/4Sch 1601.6600.2501.16001.05683.769
1-1/2Sch 101.9000.1091.68202.22202.087
1-1/2Sch 401.9000.1451.61002.03582.721
1-1/2Sch 801.9000.2001.50001.76713.635
1-1/2Sch 1601.9000.2811.33801.40614.864
2Sch 102.3750.1092.15703.65422.641
2Sch 402.3750.1542.06703.35563.657
2Sch 802.3750.2181.93902.95295.027
2Sch 1602.3750.3441.68702.23527.470
2-1/2Sch 102.8750.1202.63505.45323.535
2-1/2Sch 402.8750.2032.46904.78785.799
2-1/2Sch 802.8750.2762.32304.23837.669
2-1/2Sch 1602.8750.3752.12503.546610.023
3Sch 103.5000.1203.26008.34694.336
3Sch 403.5000.2163.06807.39277.584
3Sch 803.5000.3002.90006.605210.264
3Sch 1603.5000.4382.62405.407814.339
3-1/2Sch 104.0000.1203.760011.10364.978
3-1/2Sch 404.0000.2263.54809.88689.119
3-1/2Sch 804.0000.3183.36408.888012.518
4Sch 104.5000.1204.260014.25315.619
4Sch 404.5000.2374.026012.730310.802
4Sch 804.5000.3373.826011.496914.999
4Sch 1604.5000.5313.43809.283322.533
5Sch 105.5630.1345.295022.02027.778
5Sch 405.5630.2585.047020.005814.633
5Sch 805.5630.3754.813018.193720.800
5Sch 1605.5630.6254.313014.610032.997
6Sch 106.6250.1346.357031.73919.299
6Sch 406.6250.2806.065028.890318.994
6Sch 806.6250.4325.761026.066728.604
6Sch 1606.6250.7195.187021.131145.400
8Sch 108.6250.1488.329054.484813.413
8Sch 408.6250.3227.981050.027028.584
8Sch 808.6250.5007.625045.663543.434
8Sch 1608.6250.9066.813036.455874.770
10Sch 1010.7500.16510.420085.275718.673
10Sch 4010.7500.36510.020078.854340.526
10Sch 8010.7500.5949.562071.810464.498
10Sch 16010.7501.1258.500056.7450115.769
12Sch 1012.7500.18012.3900120.568124.191
12Sch 4012.7500.40611.9380111.931753.582
12Sch 8012.7500.68811.3740101.605388.725
12Sch 16012.7501.31210.126080.5315160.443
14Sch 1014.0000.25013.5000143.138836.752
14Sch 4014.0000.43813.1240135.276563.509
14Sch 8014.0000.75012.5000122.7185106.246
16Sch 1016.0000.25015.5000188.691942.098
16Sch 4016.0000.50015.0000176.714682.859
16Sch 8016.0000.84414.3120160.8757136.762
18Sch 1018.0000.25017.5000240.528247.443
18Sch 4018.0000.56216.8760223.6809104.778
18Sch 8018.0000.93816.1240204.1905171.108
20Sch 1020.0000.25019.5000298.647752.789
20Sch 4020.0000.59418.8120277.9456123.242
20Sch 8020.0001.03117.9380252.7190209.093
24Sch 1024.0000.25023.5000433.736163.481
24Sch 4024.0000.68822.6240402.0024171.477
24Sch 8024.0001.21921.5620365.1472296.902

23 nominal sizes across Schedule 10 / 40 / 80 / 160 · 83 rows

Why OD stays fixed and the bore moves

For a given NPS, outside diameter is constant across every schedule — that is what lets the same fittings and threads work regardless of wall thickness. Heavier schedules add material inward, so the bore shrinks while the pipe still fits the same coupling.

The area mistake

Flow capacity goes with cross-sectional area, which scales as the square of diameter. A schedule change that looks like a 7.4% diameter reduction is a 14.1% capacity reduction. Quoting the diameter figure as though it were the flow figure is the most common error in schedule comparisons.

PVC uses the same outside diameters

PVC Schedule 40 and 80 share steel-pipe ODs by design (ASTM D1785), which is why metal and plastic fittings of the same nominal size interchange. Pressure ratings do not transfer — those depend on material and temperature.

Data source and method

Dimensions
ASME B36.10M outside diameters and wall thicknesses; ASTM D1785 for PVC.
Calculation
ID = OD − 2 × wall; flow area = π(ID/2)²; weight = metal cross-section × 12 in × 0.2836 lb/in³.
Verification
Sch 40 bore checked against five published values (NPS 1/2, 1, 2, 4, 6). All exact.